bahnbilder.de Linie bahnbilder.de
Hallo Gast, Sie sind nicht eingeloggt. Einloggen | Account anmelden 
Forum   Kontakt   Impressum
 
 
 
 
 
 
 
A Burlington Northern SD70MAC heads past the sign at the Thunder Basin Coal Co. near Wright, Wyoming, Nov 2003.
A Burlington Northern SD70MAC heads past the sign at the Thunder Basin Coal Co. near Wright, Wyoming, Nov 2003.
Brent Maxwell

USA / Dieselloks | EMD / SD70M

745 640x480 Px, 01.03.2010

Here a Union Pacific train heads onto the staging track while UP and BNSF trains are being loaded. Nov. 2003.
Here a Union Pacific train heads onto the staging track while UP and BNSF trains are being loaded. Nov. 2003.
Brent Maxwell

USA / Dieselloks | EMD / SD70M

837 640x480 Px, 01.03.2010

Four trains can be loaded with coal at the same time at this facility. Here 2 are being loaded while one empty goes onto the staging track. It is a Sunday afternoon, so not quite as busy. Nov 2003.
Four trains can be loaded with coal at the same time at this facility. Here 2 are being loaded while one empty goes onto the staging track. It is a Sunday afternoon, so not quite as busy. Nov 2003.
Brent Maxwell

USA / Dieselloks | EMD / SD70M

827 640x480 Px, 01.03.2010

A pair of Union Pacific loks pull an empty coal train onto the staging track at the Thunder Basin Coal Co. near Wright, Wyoming Nov 2003.
A pair of Union Pacific loks pull an empty coal train onto the staging track at the Thunder Basin Coal Co. near Wright, Wyoming Nov 2003.
Brent Maxwell

USA / Dieselloks | EMD / SD70M

938 640x480 Px, 01.03.2010

Coal loading facility near Wright, Wyoming. BNSF and UP are loading at the same time on 10 Nov 2003.
Coal loading facility near Wright, Wyoming. BNSF and UP are loading at the same time on 10 Nov 2003.
Brent Maxwell

USA / Dieselloks | EMD / SD70M

786 640x480 Px, 01.03.2010

The loading tracks at the Thunder Basin Coal Company's Black Thunder Mine near Wright, Wyoming. This Sunday afternoon 10 Nov 2003 shows only 2 trains being loaded at the same time, one on far left and a BNSF on the third track from left while a Union Pacific veers off to right to loop around on a staging track. Speed limit for all trains is about 2 MPH.
The loading tracks at the Thunder Basin Coal Company's Black Thunder Mine near Wright, Wyoming. This Sunday afternoon 10 Nov 2003 shows only 2 trains being loaded at the same time, one on far left and a BNSF on the third track from left while a Union Pacific veers off to right to loop around on a staging track. Speed limit for all trains is about 2 MPH.
Brent Maxwell

USA / Sonstiges / Sonstiges

917 640x480 Px, 28.02.2010